Inspection chamber for green roofs

Inspection chamber for green roofs
TWZN H
Description:
Basic set of four slats for an increase of 4", fasteners are included.
Thank you!
Your submission has been received!
Your submission has been received!
Oops! Something went wrong while submitting the form.
technical information and drawings
name
download
Product variants
Bez manžety
Product variants
TYPe
Dimension
Drawing documentation
Bez manžety
Product variants
TYPe
Dimension
Drawing documentation
FLOWRATES
Flowrate of the drain in GPM (gallon per minute)
Water head (in)
Name
Type
(DN)
1
2
3
4
5
No items found.
Flowrate of the drain in GPM (gallon per minute)
Water head (in)
Name
Type
(DN)
1
2
3
4
5
6
No items found.
No items found.
Related products
No items found.